Monday, September 13, 2010
Hotel-condo land size reduced
The waterfront land that is being sold for a condo and hotel development is now smaller. Waterfront Manager Katherine Dugmore says the 2.65 acre parcel has been reduced by about half an acre because the larger area wasn't required for the projects. Dugmore says the financial hit will be minimal and that the loss could be recovered during site preparation.