Tuesday, July 31, 2012
Drainage Study Approved
The ripple effects of the May 28th flooding are still being felt. The disaster has forced the city to a have study done of the storm drainage system in the areas affected by the flooding, a study which Engineering Manager Pat Mauro hopes can be expanded in the near future. The cost of the study is expected to run about 300 thousand dollars.